After a much needed floor replacement, the RE was taken to have its yearly MOT which it passed.  It was then prepared for a trip to Alton Bus Rally on the 15th of July but unfortunately didn’t make it as the fuel lift pump failed.  All members on board were recovered safely and made it to the show however, HHW920L got recovered back to base where a new pump was fitted.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Translate »